Building height
Normal rule: The maximum height for the affected buildings is 12.0 m.
What is being asked for: Permission for the new four-storey buildings next to Kruis Road to reach 12.34 m.
Difference: 34 cm higher than the normal maximum.
Samsung Internet blocks the secure hand-over of your completed City PDF attachment.
Chrome allows the app to attach the prescribed City form to your email.
You will return to this same Erf 9702 app in Chrome.
Please comment on the three advertised building departures below. This tool helps you prepare your own submission and generates the City of Cape Town's prescribed MPBL-LUM18 PDF for you to send from your own email account.
The City's Development Management Scheme (DMS) contains rules that control how a property may be developed. These include rules about maximum building height, the number of parking bays required, and the number and spacing of vehicle entrances.
A permanent departure means the applicant is asking the City for permission not to comply fully with one of those normal development rules. For Erf 9702, the applicant is asking for three departures:
Normal rule: The maximum height for the affected buildings is 12.0 m.
What is being asked for: Permission for the new four-storey buildings next to Kruis Road to reach 12.34 m.
Difference: 34 cm higher than the normal maximum.
Normal rule: The City's parking requirements result in 146 parking bays being required for the proposed development.
What is being asked for: Permission to provide only 127 parking bays.
Difference: 19 fewer parking bays than normally required.
What does this mean? A carriageway crossing is a vehicle entrance or driveway crossing from the street into the property.
Normal rule: No more than two carriageway crossings are permitted, and the relevant crossings must be at least 12 m apart.
What is being asked for: Permission for more than two crossings, with some of them only 9.5 m, 9.4 m and 2.5 m apart instead of 12 m.
Erf 9702 is currently zoned Local Business 2 (LB2). According to the applicant's current planning motivation, the proposed dwelling houses and flats are already permitted under LB2. The current application therefore does not ask to change the zoning; it asks only for the three departures explained above.
Your completed prescribed City PDF has been created.
Keep a copy: use SAVE / DOWNLOAD PDF below if you want the file stored on your device.
If your email app does not attach the PDF automatically, attach this saved PDF before you send.
Your objection is only complete once you have emailed it.
IMPORTANT: After you send your email, WAIT for the City’s return / acknowledgement email. Keep that email as proof that the City received your submission.
When you continue to email, a copy of your completed PDF will also be sent to registrations@bbbv.org.za for the residents’ submission record.
CHOOSE YOUR EMAIL
LIVE SUBMISSION: Your email will be addressed to the City. Make sure the completed PDF is attached, then press SEND from your own email account. After sending, wait for the City’s return/acknowledgement email and keep it as proof that your submission was received.